Forward Section With Double Bank and holding Tank
© Seven Oceans Video
In front of a watertight bulkhead there is double
bank with storage compartment underneath. Built into the bottom is the new
holding tank, which can be emptied from the deck or discharged of contents by a
manual pump. The pump can also be used as an emergency bilge pump for the main
saloon area. The sealable opening above the double bank leads to an enclosure
compartment on the front deck (used for anchor, fenders, line storage). Beneath
that, the foremost opening (dark on all three pictures) leads to a space where
anchor chain can be stored.
The front interior is lit by a sturdy skylight
built into the deck.
© Seven Oceans Video
Zpět NIKE II
Zpět stavba lodí
|